** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
** PLEASE DESCRIBE THIS IMAGE **
Back to Category Back to Category

McWane Cast Iron Pipe Co - Birmingham, AL







Summary: Provide and design Cupola non-metallic charge make-up system: Project to load both stone and FeSi material into a system capable of preparing the required batch sizes for loading into the cupola charge bucket. The system would be capable of preparing 30 batches per hour.

  • Provide mechanical, electrical and civil engineering
  • Relocating the existing gravity conveyor take-up on the coke conveyor
  • Provide 2 in-feed hoppers for bobcat bucket loading
  • Provide 2 18-inch unloading conveyors
  • Two water storage bins 290 cu. ft. each
  • Provide a belt conveyor approximately 60 ft. long
  • Provide necessary concrete pads
  • Mechanical and Electrical installation
  • Electrical controls for batch control and system operation