Lehigh Cement - Leeds, AL Description: New Electrical Substation Summary: This was a Turn Key contract to engineer and install a new electrical substation. 20 Feet of 250A, 115KV aluminum angle buss. (3) buss support structures. (1) 115KV electric gang operated switch (1) vacuum type 115KV switch 4000A, 5KV service in cable tray with 500KCM wire and all necessary termination kits. Service will run from transformer to 4160V main switch (1) main 4160V breaker (1) 5KV fused load break switch (1) Backup battery set (1) 25KVA substation transformer, swtich and breaker panel for 220/110V power (4) Substation flood lights Substation fencing with main gate and (2) man gates Substation grounding Substation gravel Necessary substation concrete pads Interconnect all substation control equipment Remove existing wiring for existing 4160V switchgear and reroute the existing switchgear wiring via manhole to the new 4160V