Description: Engineering
and Electrical Installation.
Contract: $3.2 Million.
Schedule: January 98 through August
99.
Summary: Project included Electrical
Engineering and Installation for Danieli
supplied Equipment and Siemens supplied
Electrical Equipment, with SMI Steel acting
as their own General Contractor. Equipment
consisted of a new 256 Cooling Bed,
1200 H.P. Straightener, 200 H.P. Shear,
250 H.P. Abrasive Saw, Gauge Beam, Two
Sided Automated Stacker and Binding /Bundling
Equipment to prepare Material for shipping.
All Electrical Utilities and Secondary
Power Distribution were also included.
To prepare the area for the new Equipment,
the Existing Cooling Bed Electrical Equipment
had to be relocated and a Major Electrical
Room had to be Demolished with all the
13.8 KV and 480V Circuits rerouted to
a new three story Electrical Room. All
Dates for the Electrical tie-ins and start
ups were met for a successful project.
EC&S has enjoyed a successful relationship
with SMI since 1986. We have successfully
completed 4 major projects for them.