Description: Turnkey
installation for a green sand mold line.
Contract: $2.8 million.
Schedule: Nov 97 thru July 98.
Summary: The project included
the installation of a Disamatic Mark V
molding machine and associated equipment.
EC&S was responsible for all vibratory
casting handling equipment, all return
sand system equipment, a sand mullor,
all prepared sand system equipment, a
pressure pour system, all of the dust
collection equipment, and the finishing
equipment which was the blast machine,
conveyors and grinders. EC&S provided
engineering services for the layout, installation,
power distribution and instrumentation
of the system, this included building
control panels and providing the PLC programming
for the system.