Projects
Robotics
Home About Us Service Employment Contact Us Info Library
 







EC&S Representative in China:

Mingzhi Technology
Suzhou, Jiangsu Province
Mr. Qiu He
Tel: 0512-67169566-100

Description: China Cupola Project Weichai Power Ltd., Weifang, China

Summary: This is a Turn Key Contract to engineer, install and commission a new state of the art 45 ton/hour cupola melt system with new controls and equipment to meet U.S. MACT standards for cupola and emission-control technology. The following is a list of equipment and systems that were included in the project:

Below Charge Take off cupola
Combustion Chamber with lid
Main blower with automatic air weight control
After burner system with proportional control
Combustion Chamber spray nozzles with proportional water flow control
Hot blast recuperator
Flue Gas Cooler and Fan with proportional control
Eight module baghouse guaranteed to meet MAC standards with automatic controls
Automatic module cleaning
VFD on Fan for proportional control
Broken Bag Detectors
Automatic Charge and Delivery System (bucket and skip hoist)
Complete integrated PLC control system with graphical operator interface and
Historical data logging
System Stack

Back to Cupolas